Comfort Inn Boston / Logan Installs Chemical-Free Electronic Water Treatment System for Cooling Towers & Heat Exchanger
The Comfort Inn & Suites Boston/Logan International Airport has installed a FlowMark “chemical-free” (also called “pulsed-power”) water treatment system for its cooling tower and heat exchanger. The FlowMark system, installed by Conservation Solutions Corporation (CSC), has sharply cut water use and eliminated the need for hazardous chemicals to control calcium, bacteria, scale, corrosion and biofilm.
“Chemical-free” water treatment systems are used to treat cooling towers, chillers, heat exchangers and evaporative condensers. They replace chemicals with an electronic field. “Chemical-free” systems have the best payback for hotels with cooling towers and chillers.
The Comfort Inn’s new system cost $6,300 to install and saves the hotel roughly $5,685 per year.
Financial Summary
Annual Water & Sewer Savings $2,724
Annual Chemical Savings 2,400
Annual Electricity Savings 366
Annual Maintenance Contract Savings 195
Total Savings: $5,685
Simple Payback: 1.1 years
Return on Investment (ROI): 89.8%
Read More: Comfort Inn Boston
Zamarano Hospital in Pacoag, RI is pleased with their FlowMark System
/in FlowMark News, Project Profile /by Richard EscueChiller FlowMark Water Treatment System with conductivity based controls.
A FlowMark Chemical-Free Water Treatment System was installed on the 300 ton steam
powered Absorption Chiller and cooling tower. In addition, a bag filtration and Creative Water
Solutions ProMoss filtration system was installed to maintain clean water in the cooling
system. This system eliminates hazardous chemical use for the cooling system. The biological
counts are consistently less than 500 CFU/ml, corrosion is controlled and the water in the
cooling tower is crystal clear.
Click Here to view Case Study
Volusia County Schools Evaluates FlowMark Cooling Tower Water Treatment
/in FlowMark News, Project Profile /by Richard EscueIn cooperation with Volusia County Schools HVAC Management, FlowMark Water Treatment of Daytona Beach, FL has successfully completed a 6 month paid trial to prove the validity of their Web Induction Pulsed Power and Advanced Oxidation Systems. All conventional chemical treatment was suspended during the trial period. The FlowMark chemical free system provided excellent scale and bacteria control while operating at high cycles of concentration to conserve water. Management was impressed and is not considering a chemical free water treatment bid for all schools.
Click here for more project details.
Fjord Line Ships Use FlowMark to Condition Potable Water
/in FlowMark News, Project Profile /by Richard EscueJanuary 2013
Fjord Line of Denmark has purchased two FlowMark Web Induction Pulsed Power systems to
protect the potable water plumbing systems of two new ships.
The Web Induction systems are installed on the discharge piping o the bulk water tanks in
order to prevent calcium scale from forming throughout the ships extensive plumbing system.
Success was immediately apparent when the ships engineers realized that FlowMark was
preventing scale from forming on the quartz tubes of the ships Ultraviolet Disinfection System.
FlowMark is protecting hot water boilers. kitchen equipment, cabin fixtures. disinfection
systems and all piping from hard water scale.
For system photos Click Here to download document.
Plaza Resort & Spa Goes Green
/in FlowMark News, Project Profile /by Richard EscueIn effort to save water and reduce their environmental footprint, the Plaza Resort & Spa in Daytona Beach, Fl. has changed the way they treat their cooling tower water. Waterhouse Corporation of Deltona, Fl. was contracted to replace the existing chemical water treatment program on 5 cooling towers with chemical free systems manufactured by Flow-Mark Water Treatment of Daytona Beach, Fl.
The FlowMark Pulsed Power Systems allow the cooling towers to operate at higher cycles of concentration which saves an enormous amount of water that was previously being wasted. FlowMark’s Advanced Oxidation Process provides the biological control, killing bacteria including Legionella, viruses, fungi and mold. The cooling tower water is now crystal clear and safe.
Click here to read full project including data.
Comfort Inn Boston / Logan Installs FlowMark
/in FlowMark News, Project Profile /by Richard EscueComfort Inn Boston / Logan Installs Chemical-Free Electronic Water Treatment System for Cooling Towers & Heat Exchanger
The Comfort Inn & Suites Boston/Logan International Airport has installed a FlowMark “chemical-free” (also called “pulsed-power”) water treatment system for its cooling tower and heat exchanger. The FlowMark system, installed by Conservation Solutions Corporation (CSC), has sharply cut water use and eliminated the need for hazardous chemicals to control calcium, bacteria, scale, corrosion and biofilm.
“Chemical-free” water treatment systems are used to treat cooling towers, chillers, heat exchangers and evaporative condensers. They replace chemicals with an electronic field. “Chemical-free” systems have the best payback for hotels with cooling towers and chillers.
The Comfort Inn’s new system cost $6,300 to install and saves the hotel roughly $5,685 per year.
Financial Summary
Annual Water & Sewer Savings $2,724
Annual Chemical Savings 2,400
Annual Electricity Savings 366
Annual Maintenance Contract Savings 195
Total Savings: $5,685
Simple Payback: 1.1 years
Return on Investment (ROI): 89.8%
Read More: Comfort Inn Boston
FlowMark Disinfection Systems Now Available
/in FlowMark News /by Richard EscueClick here to view the DS product line
PROJECT PROFILE MEDICAL BUILDING
/in Project Profile /by Richard EscueOver the course of 12 months the conductivity bleed set point was gradually increased to attain maximum water savings. Cycles of concentration by chlorides were increased from 4.1 to 14.5 with no new scale forming.
Click Here for full Project Profile (.pdf)
FlowMark Replaces Chemicals
/in FlowMark News, Project Profile /by Richard EscueClick Here for full Project Profile (.pdf)
FLOWMARK DAF TEST
/in FlowMark News, Project Profile /by Richard EscueClick here to read more (.pdf)
DAF TEST BLOOD REMOVAL
/in FlowMark News, Project Profile /by Richard EscueInfluent to the DAF was pumped from a batch equalizaon tank that was connuously mixing.
Click here to read more (.pdf)